Bunninadden Waste Water Treatment Plant, Co. Sligo

Overall Groundwork’s Sub – Contract & Building Construction

  • Date: March 2012 – October 2012
  • Client: EPS / Sligo County Council
  • Project Type: Waste Water
  • Our Role: PSCS – Groundworks

About this Project

Some of the work we were required to complete as part of this waste water project included:

  • Site Clearance
  • Demolition of Existing Services
  • Bulk Excavation
  • Shutter and Install Underground Holding Tanks
  • Foul Water Drainage System – Pressure Pipework
  • Storm Water Drainage System
  • Watermain Installation including connections to existing
  • Site Services
  • Fencing and Crash Barriers
  • Roadways, Footpaths and Kerbing
  • Landscaping
  • Construction of Control Building